OSIS GROUP
View all projects

Industrial Concrete Flooring

Tamer Group Warehouse

Tamer Group Warehouse
Country
KSA
Location
Jeddah
Area
20,100 m²
Service
Industrial Concrete Flooring
Floor type
FM1 & DM1
Year
2019

The Tamer Group, a leader in logistics and distribution, required a world-class warehousing facility in Jeddah to support their high-density storage operations. The project centered on a 20,100 m² footprint that demanded rigorous precision to accommodate Very Narrow Aisle (VNA) racking systems.

The core challenge lay in achieving the dual requirement of FM1 (Free Movement) and DM1 (Defined Movement) classifications according to TR34 standards. Specifically, the DM1 areas required near-perfect flatness to prevent 'mast sway' in high-reach trucks, which can compromise both safety and operational speed. Maintaining these tolerances over such a vast area while managing the local climate's impact on concrete curing required exceptional technical oversight.

Let's build something together

Have an industrial flooring or construction project? Contact our technical team.

Request a quote