OSIS GROUP
View all projects

Industrial Concrete Flooring

Logistics Village Phase 5

Logistics Village Phase 5
Country
State of Qatar
Location
Doha
Area
46,000 m²
Service
Industrial Concrete Flooring
Floor type
DM2
Year
2016

The Logistics Village Phase 5 for Gulf Warehousing Company (GWC) in Doha represented a major expansion of one of the region's most critical logistics hubs. The primary challenge was the scale of the facility, covering 46,000 m², which needed to be engineered to support high-intensity logistics operations including high-reach racking and heavy forklift traffic.

The client required a Direct Finished Floor (DM2) classification according to TR34 standards. Achieving this level of flatness over such a vast area in the demanding climate of Doha was complex. The project demanded rigorous temperature control of the concrete and high-performance joint detailing to prevent long-term maintenance issues under the weight of constant vehicular movement within the warehouse.

Let's build something together

Have an industrial flooring or construction project? Contact our technical team.

Request a quote