The Ali Bin Ali Group is a privately owned company, tracing back to 1945. One of the Group’s investments concerned the Construction of a Logistics Park at the Bou Fsila Area, in Qatar.

The Park included several thousand square meters of Temperature Controlled & Ambient Temperature W/houses, Chilled & Frozen goods W/houses, Container Depots, Chemicals’ Storage W/houses and Administration buildings.

Man Enterprise Qatar as the Main Contractor and Ali Bin Ali trusted our company for the construction of Industrial Concrete Floors for Warehousing & Logistic Park At Abou Fsila (Ali Bin Ali). Another challenging project to be constructed within limited timeframe but with the highest quality.

Project Details

Client: Ali Bin Ali
Consultant: Erga Qatar
Main Contractor: Man Enterprises Qatar
Total Build up Area: 95,000m2
Floor Type & Category: Jointed Free Movement, FM2 Slab on Grade as per TR 34 4th Edition